“Optimizing Production Scheduling With the Spotted Hyena Algorithm: A Novel Approach to the Flow Shop Problem”. Reports in Mechanical Engineering 4, no. 1 (July 16, 2023): 90–103. Accessed November 25, 2024. https://rme-journal.commercialbiotechnology.com/index.php/asd/article/view/98.