Optimizing production scheduling with the spotted hyena algorithm: A novel approach to the flow shop problem. Reports in Mechanical Engineering, [S. l.], v. 4, n. 1, p. 90–103, 2023. DOI: 10.31181/rme040116072023m. Disponível em: https://rme-journal.commercialbiotechnology.com/index.php/asd/article/view/98.. Acesso em: 25 nov. 2024.